影音先锋女人av噜噜色,亚洲轮理视频在线观看,婷婷综合色色色,国产精品一区一区

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿(mào)易試驗(yàn)區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

生物脫硫設(shè)備冷卻塔的安裝

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應(yīng)根據(jù)設(shè)備的各種條件,考慮其安裝位置的地面及其荷載能力,同時也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時應(yīng)注意冷卻塔的基礎(chǔ)按規(guī)定的尺寸預(yù)埋好水平鋼板,各基礎(chǔ)點(diǎn)的標(biāo)高應(yīng)在同一標(biāo)高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應(yīng)放置水平。水塔在施工安裝時,為防止壓壞底盤,施工人員應(yīng)踏在底盤的加強(qiáng)筋上,在安裝塔外殼、底盤等纖維件時,為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認(rèn)底盤不變形,附近干凈、干燥的條件下,為避免使用時漏水可在接觸處鋪設(shè)纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風(fēng)不良和出現(xiàn)濕空氣回流的場合,須安裝在通風(fēng)良好的場所。否則將會降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時,應(yīng)根據(jù)施工圖指明的坐標(biāo)位置就位,并應(yīng)找平找正,設(shè)備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應(yīng)正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.
以上就是為大家介紹的有關(guān)生物脫硫的詳細(xì)的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://m.zzzop.cn
The above is a detailed introduction of biological desulfurization for you. I hope it will be helpful to you. If you have any questions, please contact us. We will provide you with professional services http://m.zzzop.cn

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
漂亮女内射免费网站| 亚洲综合一区二区高清| 淫射综合网| 亚洲国产人天堂久久综合免费观看| 欧米日本精品一区二区| 天堂精品久久久2| 人妻互换免费中文字幕| 宅男午夜肏屄视频| 丝袜 国产 少妇 在线| 性激烈欧美日韩中文字幕| 欧美射日韩| 亚洲大胆人体视频| 黄色网址乱伦小说情色| 夜夜久久综合| 91福利区久久久久久| 久久大久久六十路| 狼友女av| 黑人双叉欧美| 精品韩漫一区二区三区| 顶级高潮集合| 日本久久'A| 熟女精品在线一区| 亚洲精品中文字母123区高清无 | 人妻久久久一区二区三区| K8y成人网站| 国产欧美在线观看量| 台湾中文二区三区在线观看| 日韩欧美久久综合| 黑人人鸡巴| 最新亚洲日韩激情综合| 97青青超碰| Caoporn超碰香蕉| 色婷婷伦线| 中文字幕爆乳巨爆乳系列无码| 麻豆久久精品成人三级| av日韩人妻| 国产美女搞黄| 国产人妖久久| 天天干天天爽夜夜爽免费| 国产中文日本欧美| 少妇日韩AV|